Project handling
Projects are handled in close cooperation with the customers‘ specialists. The manufacturers themselves are usually present throughout the testing period since the test objects are mainly prototypes or vehicles of the first series.
The measurement data must be recorded online and analysed immediately in order to be able to take the test results into account in subsequent investigations. This allows adaptations and optimisation options to be checked immediately and efficiently.
24-hour operation
Climatic wind tunnel tests can be extremely time-intensive, in particular for large test objects, because of the long adaptation processes and settling times involved in producing the climatic conditions desired. Tests in the Vienna Climatic Wind Tunnel are therefore performed 24 hours a day, 7 days a week, thus considerably extending the effective testing time for the client.